Case Study
Cringleford Primary School
Project timescale:
6 Weeks
Project Summary
•
2000 Tons of crushed concrete left on site for re-use
•
99.2 tons of general rubbish left site with a recycling rate of 95.39%
•
71.8 tons of wood left site with a recycling rate of 100%
•
Total man hours on site 657
Download Case Study