Case Study

Anglia Bakeries Silo Removal

Project timescale:
16 Working Days

Our project in Rackheath for a new client went to plan and finished ahead of schedule

This project had a challenge which did force a bit of down time on site

We had to work around a live site with numerous lorries arriving and leaving site throughout the day

nevertheless the guy’s on site worked with our client and made sure there was no hiccups on ether side

Huge thanks to all involved on this project

Project Summary

  • 4.54 Tons of General Waste Removed from site
  • 168.80 Tons of Scrap Metal Removed from site
Download Case Study